BIM Coordination & Clash Detection
Architectural Gradient Strips

BIMCoordination&ClashDetection

HomeBIM Coordination & Clash Detection

TransformModelsintoConflict-Free,Construction-ReadyIntelligence.

BIM Coordination is not just the process of assembling models; rather, it requires all of the building systems to be coordinated in the real world. Clash detection is a service that analyzes the BIM models to detect clashes and soft clearance violations as well as workflow conflicts in the pre-construction stage.

"Reduce rework costs by up to 70% with 100% clash-free model coordination."

Rule-based clash detection is performed through Navisworks and Revit according to your BEP & ISO 19650 specifications. Our coordination processes span LOD 100 to LOD 400, ranging from alignment at the concept stage to system integration at the fabrication stage.

Hard Clash Detection

Physical clashes between elements

Soft Clash Detection

Clearance and Maintenance Access Violations

Multi-Disciplinary Coordination

Multi-discipline coordination with federated Arch, Struct & MEP models

BCF Issue Tracking

Managed clash detection with BIM Collaboration Format

FederatedModelCoordination:FromIsolatedDesigntoIntegratedReality

BIM coordination starts with aggregating discipline-specific models—architecture, structure, and MEP—into a single federated environment. Using Navisworks, we run rule-based clash tests to identify every geometric conflict and clearance violation within the model space.

Each clash is reviewed, categorized by priority, and assigned to the responsible trade through an issue tracking system. Our coordination cycles continue iteratively until the model is fully coordinated and construction-ready—eliminating surprises during installation.

Multi-Discipline Model Federation (Arch, Struct, MEP)
Automated Clash Detection with Tolerance Rules
BCF Issue Logging & Resolution Tracking
Clash Report Viewpoint (Issue Tracking)Clash Report Viewpoint (Issue Tracking)
Federated Coordination Model (Navisworks)Federated Coordination Model (Navisworks)

SmartClashResolutionforSophisticatedBuildingSystems

Our clash resolution approach involves automatic clash detection and human intervention. Instead of simply detecting issues, we recommend practical ways of solving them—rerouting MEP systems, altering the positions of structural penetrations, or modifying clearances, among others.

The federated modeling process provides full visibility of all building systems in order not to fix one problem and create another. The coordination log tracks all problems until they are solved; therefore, we can have a fully coordinated model without any clashes.

Smart BIM Clash Resolution & Coordination

BenefitsofBIMCoordination&ClashDetectionServices

Prevent Costly Rework

Resolve site conflicts before construction begins, saving time and materials.

Enhance Multi-Trade Coordination

Ensure seamless integration of MEP, structural, and architectural systems.

Accelerate Project Timelines

Eliminate delay-causing on-site clashes and maintain construction schedules.

Optimize Construction Costs

Reduce change orders, material waste, and labor inefficiencies.

Scalable Offshore Support

Flexible coordination capacity for large-scale or fast-track projects.

Global Standards Compliance

Adhere to BEP, ISO 19650, and project-specific coordination requirements.

FileFormatsWeSupport

We work with industry-leading coordination platforms to ensure seamless interoperability across your project team.

Swipe to see more
COORDINATION TOOLPURPOSESUPPORTED INPUT FORMATSDELIVERABLE FORMATS
Navisworks ManageAdvanced clash detection & federated coordinationNWC, RVT, IFC, DWGNWD, NWF, HTML Reports
Autodesk RevitNative model authoring & coordinationRVT, RCP, IFCRVT, IFC, 2D Drawings
BIM 360 / ACCCloud-based coordination & issue trackingRVT, NWC, IFCBCF, Coordination Logs
SolibriRule-based model checking & validationIFC, RVTSMC, IFC, Validation Reports
BCF ManagersIssue tracking & clash resolution workflowsBCF, IFCBCF, PDF Reports

IndustriesWeServe

We are experienced in coordinating all projects, whether they be for commercial high-rise buildings or critical infrastructure.

Commercial & Office

Commercial & Office

Coordination of MEP for mixed-use towers and corporate campuses.

Industrial & Manufacturing

Industrial & Manufacturing

Plant design validation and utility clash analysis.

Heritage & Historic Restoration

Heritage & Historic Restoration

Sensitive coordination of retrofit and preservation projects.

Healthcare & Hospitals

Healthcare & Hospitals

Complex system coordination for critical care facilities.

Infrastructure & Transportation

Infrastructure & Transportation

Clash management between airport, station, and utility corridor.

Education & Institutional

Education & Institutional

Campus-wide BIM coordination for staged construction.

PopularQuestions

BIM coordination involves the merging of architectural, structural, and MEP models into a single federated model to detect and correct any spatial conflicts. The clash detection technique is used to detect three types of conflicts, namely: hard clashing (which involves physical interference), soft clashing (involves violation of clearance), and workflow clashing (schedule conflicts).
Our clash detection is based on the rules set by you in your BIM Execution Plan, which are tolerance-based. The tolerance level we use allows us to detect clashes down to millimeter accuracy and also allows the configuration of clearances for MEPS, access, maintenance, and seismic issues.
We support RVT, IFC, NWC, and DWG formats for model acceptance. We have Navisworks Manage as our primary clash detection tool, BIM 360 as our cloud collaboration tool, and Solibri as our primary rule-based validation tool.
For complex projects, we implement structured coordination workflows with regular coordination cycles. We use federated models to manage large datasets, prioritize clashes by criticality, and conduct weekly coordination meetings to track resolution progress. Our BCF-based issue tracking ensures every clash is logged, assigned, and verified before final delivery.

ReadytoEliminateClashesandStreamlineYourConstructionWorkflow?

Get a clash-free, coordinated BIM model that's ready for the field—before you break ground.